Our Project

OUR PRESTIGIOUS PROJECT


Project Name Name of the Employer Description of work Value of Contract (Rs. Lac) Date of Issue of Work Order Stipulated Period of Completion Actual date of completion
Gudha Dam, Bundi Executive Engineer, Water Resources Division, Bundi Rehabilitaion of Gudha Dam (including Civil & Mechanical ) under R.W.S.R.P.(Dam Safety) Distt. Bundi Raj. 2943.91 1/9/2012 4/8/2014 6/10/2013
Orai Dam, Chittorgarh  Executive Engineer, Water Resources Division, Chittorgarh Rehabilitation of Earthen Dam, Non over flow and over flow portion of Orai Irrigation Project Distt. Chittorgarh (Rajasthan) 1591.09 2/7/2011 5/7/2013 5/7/2013
The Indure Private Ltd. The Indure Private Ltd. New Delhi Civil Works at RRVUNL-Chhabra TPP-2×250 MW Units # 3&4-Civil Works for Wagon Tippler, Stacker Reclaimer, Stock Pile, Transfer Towers, Electrical Control Rooms/MCC Rooms etc. 1613.7 19/08/2011 30/04/2013 30/04/2013
Adani Infra India ltd. Kawai Thermal Power Project Distt. Baran(Rajasthan) Adani Infra India ltd. Kawai Thermal Power Project Distt. Baran Executioon of Balance Civil, Miscellaneous structural & architectural works for CHP for 1320 MW Kawai Thermal Power Project Village Kawai,Tehsil Atru,Distt. Baran Raj. 2833.62 15/05/2011 30/04/2013 30/04/2013
Adani Power Rajasthan ltd. Kawai Thermal Power Project Distt. Baran (Rajasthan) Adani Power Rajasthan ltd. Kawai Thermal Power Project Distt. Baran Execution of Civil & associated Works for construction of an Anicut across River Parwan near Village Baldevpura,Tehsil Atru,Distt. Baran Raj. 1042.92 1/2/2012 6/10/2012 6/10/2012
Arniyali Lift Minor Narmada Canal Project Division IV, Sanchore (Rajasthan) Executive Engineer, Narmada Canal Project Division IV, Sanchore Execution of Earth work PCC Block Lining & Pucca Structure of Daboi Minor, Daboi Sub Minor, Dholi Nadi Sub Minor of Daboi Minor, Meghawa Minor, Panawali sub Minor of Arniyali Lift Minor 1151.20 2/6/2010 2/4/2012 2/4/2012
Chambal Right Main Canal
Kota & Baran, Rajasthan.
Executive Engineer Chambal Project div. CRMC Kota & Baran, Rajasthan. Rehabilitation of Chambal Right Main Canal in Patches from Km. 46 to 61.50 Km. in Dist. Kota & Baran, Rajasthan. 5969.00 16/10/2008 15/10/2011 15/10/2011
Godhi Distributory Tandula Durg Chattisgarh Executive Engineer, Tandula Water Resources Division, Durg Chattisgarh
Tel. No.[0788] 2323124, Fax[0788] 2323124
Remodeling and lining of Godhi Distributory from RD 19010 to 34024 m (Group-IIIrd) 643.59 10/7/2008 4/4/2010 4/4/2010
Godhi Distributory Tandula Durg Chattisgarh Executive Engineer, Tandula Water Resources Division, Durg (Chattisgarh) Tel. No.[0788] 2323124 Fax[0788] 2323125 Remodeling and lining of Godhi & Construction & Repair of 22 Nos Structures from RD 9225 to 19010  (Group-IInd ) 609.91 10/7/2008 30/04/2010 30/04/2010
Godhi Distributory Tandula Durg Chattisgarh Executive Engineer, Tandula Water Resources Division, Durg (Chattisgarh) Tel. No.[0788] 2323124 Fax[0788] 2323124 Remodeling and lining of Godhi Distributory & Construction & Repair of 18 Nos Structure from RD 0 to 9225 m (Group-Ist ) 667.68 10/10/2008 4/4/2010 4/4/2010
Sanchore Lift Distributary Narmada Sanchore (Rajasthan) Executive Engineer, Narmada Canal Div. III, Sanchore (Rajasthan) Tel. No.[02973] 224422,Fax [02973] 224422 Execution of Earth work, Pucca Structures and Cement Concrete Lining By Paver  Machine of Sanchore Lift Distributory Km. 10.05 to 46.35 (Tail) off taking from Km. 7.88 of NMC 1801.16 25/07/2008 23/05/2009 20/05/2009
Paladi Sub Minor Narmada Canal Div. III Sanchore (Rajasthan) Executive Engineer, Narmada Canal Div. III Sanchore (Rajasthan) Tel. No.[02973] 224422,
Fax [02973] 224422
Earth work, Pucca Structure, Single P.C.C. Block Lining of Paladi Sub Minor off-taking form Choura Minor from 1.140 333.76 5/10/2008 8/9/2009 8/9/2009
Supkona Distributory Tandula Durg Chattisgarh Executive Engineer, Tandula Water Resources Division, Durg (Chattisgarh) Tel. No.[0788] 2323124 Fax[0788] 2323124 Remodeling and lining of Supkona Distributory from Rd 16800 M to 22650 M (Group-4th) 410.19 21/04/2008 20/04/2009 20/04/2009
Supkona Distributory Tandula Durg Chattisgarh Executive Engineer, Tandula Water Resources Division, Durg Chattisgarh Tel. No.[0788] 2323124 Fax[0788] 2323125 Remodeling and lining of Supkona Distributory from Rd 11250 M to 16800 M (Group-3rd) 418.95 13/03/2008 28/02/2010 28/02/2010
Supkona Distributory Tandula Durg Chattisgarh Executive Engineer, Tandula Water Resources Division, Durg Chattisgarh Tel. No.[0788] 2323124 Fax[0788] 2323124 Remodeling and lining of Supkona Distributory from Rd 0 M to 6000 M (Group-1st) 399.63 13/03/2008 3/12/2009 3/12/2009
Punj Llyod Ltd., New Delhi/Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Chabbra Thermal Power Project Chabbre Distt- Baran (Rajasthan) Punj Llyod Ltd.
Gurgaon
Tel No. [0124] 2620123
Fax [0124] 2620777
Civil Work for Coal Handling Plant of 2X250 MW Chhabra Thermal Power Plant, Chhabra (Rajasthan) including Complete Construction of 2 No. Wagon Tippler, Tunnels, Stacker reclaimer, Emergency reclaim hopper. (Excluding Cost of Cement & Steel) 989.79 3/5/2007 3/5/2008 3/5/2008
Bhimsagar Irrigation Project Jhalawar (Rajasthan) Executive Engineer, Water Resources Division, Jhalawar (Rajasthan) Tel. No.[07432] 232349 Fax [07432] 233855 Balance work of Rehabilitation of Left & Right main Canal including Distribution System of Bhimsagar Irrigation Project 510.45 19/03/2007 18/03/2009 18/03/2009
Patiala Nadi  Kaithal (Haryana) Executive Engineer, Const. Div. No. 3 Kaithal (Haryana) Tel. No.[01746] 235358
Fax [01746] 235358
Construction of  Siphon Aqueduct at RD 18660 on BML Hansi Branch-Butana Branch Multipurpose Links Channel Crossing on Patiala Nadi including construction of links 1100.85 25/01/2007 17/06/2008 17/06/2008
Tata Project Ltd., Hyderabad/Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Tata Project Ltd.
Secunderabad
Tel No. [040] 66238801
Fax 66172535
Civil Foundation work package for foundation in main plant area of RRVUNL at 1X195 MW Kota Super Thermal Power Station Stage V unit #7, Kota (Raj.) (Excluding Cost of Cement & Steel) 702.00 15/12/06 2007-2008 2007-2008
Minimata bango Canal Dn. No.5, Kharsia,Distt-Raigarh, Chattisgarh Executive Engineer, Minimata bango Canal Dn. No.5, Kharsia Tel. No.[07762] 272414
Fax [07762] 272414
Construction of Cement Concrete Lining of Kharsia branch Canal From R.D. 11000 M. to 21825 m. and 22690 m. to 24600 1133.30 21/02/2006 31/03/2008 31/03/2008
Ratoda Distributory Narmada Canal Division-IInd, Sanchore (Rajasthan) Executive Engineer, Narmada Canal Division-IInd, Sanchore Tel. No.[02973] 224422,
Fax [02973] 224422
Execution of Earth work, Pucca Structure & Single P.C.C Block the Lining of Ratoda Distributory 1009.88 12/11/2005 18/03/2008 18/03/2008
Tandula Main Canal from Mile 46 to 68.80 Durg (Chattisgarh) Executive Engineer, Tandula Water Resources Division, Durg (CG) Tel. No. [0788] 2323124 Fax[0788] 2323124 Remodeling and C.C. Lining by paver Machine Including 14 No’s structures of Tandula Main Canal form Mile 46 to 68.80 2565.81 31/10/2005 31/3/2008 31/3/2008
 Delhi Water Supply Scheme From RD 201872 to 223000 Except through section from Rd 219800 to 221300 Executive Engineer, Const. Division NO. Sonipat,Haryana Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 201872 to 223000 Except through section from Rd 219800 to 221300 585.42 17/7/2005 3/5/2007 3/5/2007
Delhi Water Supply Scheme From RD 175000  to 201872 Executive Engineer, Const. Division No. 24, Panipat,Haryana Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 175000  to 201872 564.04 26/7/2005 31/7/2007 31/7/2007
Delhi Water Supply Scheme From RD 145250 to 175000  Executive Engineer, Const. Division No. 23, Panipat,Haryana Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 145250 to 175000  576.81 20/7/2005 20/7/2007 20/7/2007
Delhi Water Supply Scheme From RD 223000 to 243700 Executive Engineer, Const. Division Sonipat, Haryana Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 223000 to 243700 527.09 15/6/2005 3/5/2007 3/5/2007
Nandsamand Irrigation project. Rajsamand(Raj.). Executive Engineer, Water Resources Division Rajsamand(Raj)Tel. No.[02952] 230002
Fax [02952] 230714
Rehabilitation of Right Main Canal &Rajiyawas minor including pucca works of Nandsamand Irrigation project 536.00 30/06/2004 8/7/2007 8/7/2007
Narmada Main Canal from Km. 65.00 to 74.00 at Sanchore (Rajasthan) Executive Engineer Narmada Canal Proj. Dn. II, Sanchore (Rajasthan) Execution of Earth work, Cement Concrete Lining By Paver Machine & Pucca Structures of Narmada Main Canal from Km. 65.00 to 74.00 . 746.70 3/6/2004 3/5/2006 3/5/2006
Rajasthan Giral Lignite Thermal Power Plant Distt. Barmer (Rajasthan) Executive Engineer GLTPP, RVUNL, Barmer Construction of Raw Water Reservoir & Pump House GLTPP, Barmer 235.43 27/1/2004 2/11/2005 26/6/2005
Ghambhiri Dam Distt.- Chittorgarh(Raj.) Executive Engineer , Water Resource Dn. !st Chittorgarh (Raj.)  Construction of Additional Spillway remoulding at spillway arrangement work, widening of embankment etc. at Gambhiri Dam. 728.01 31/10/2003  31/03/06 31/03/06
Visnagar Distt. Mehsana, Gujrat Executive Engineer Dharoi Canal Dn. No. 3 Visnagar Distt. Mehsana, Gujrat Constructing Weir,Diaphgram wall, Training wall & protection work of Bhakhar Water Resources Project near Village Vanangla, Taluka Unjha, Dist Mehsana of Gujrat State. 381.09 27/6/2003 27/11/2004 27/11/2004
Gudha Irrigation Project Distt. Bundi (Rajasthan) Executive Engineer, Irrigation Div. Bundi (Rajasthan) Rehabilitation of RMC Gudha project Bundi 781.00 25/03/2003 31/082006 31/082006
(1X195 MW stage – IV at Kota Tharmal Power Station. Superintending Engineer, Civil RRVUNL KTPS, Kota Civil and architectural works in super structure of Main Power House Building for Unit – VIth (1X195 MW stage – IV at Kota Tharmal Power Station. 264.36 24/05/2002 9/5/2003 9/5/2003
Narmada Main Canal  K.M. 7.88 to 51.50 at Sanchore (Rajasthan) Executive Engineer Narmada Canal Proj. Dn. I, Sanchore (Rajasthan) Tel.[02979]223903 Earth work, cement concrete lining by paver machine, pucca structures for Narmada Main Canal  K.M. 7.88 to 51.50 3692.00 3/1/2002 31/8/2004 31/8/2004
Rajasthan Rajya Vidyut Utpadan Nigam Ltd.,Kota Thermal Power Station, Kota (Rajasthan) Superintending Engineer, Civil RRVUNL KTPS, Kota Hard Rock Foundation & Other associated works for Boiler area, Mill bay & ESP area Unit VI, KTPS, Kota (Raj.) 300.55 12/3/2001 3/3/2003 30/3/2003
Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan Superintending Engineer,(Civil III) RVUN STPS, Suratgarh Construction of C.W. Pump House STPS for Stage –III, Unit V, Suratgarh. 170.88 31/10/2001 19/1/2003 1/10/2003
Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan Superintending Engineer,(Civil III) RVUN STPS, Suratgarh Construction of Desilting Chamber Intake Pumphouse & Other associated works.  247.79 13/09/2001 10/12/2002 10/8/2002
Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan Superintending Engineer, (Civil III )RVUN STPS, Suratgarh RCC Foundation & Other associated works for ESP & ID Unit – 5 at STPS Stage –III. 207.15 6/8/2001 26/5/2002 25/5/2002
Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan Supreintending Engineer STPS, RRVUNL, Suratgarh Civil work at CHP Package C Stage II, STPS RRVUNL Suratgarh,  375.00 5/8/2001 12/7/2001 12/7/2001
Gammon India Limited, Mumbai Gammon India Limited for Kota Thermal Power Station Construction of Hard Rock Excavation for Foundatio
n of Cooling Tower with casting of RCC raft for Unit VIth of Kota Thermal Power Station.
35.00 10/8/2001 10/8/2002 10/8/2002
Narmada Main Canal  K.M. 0.00  to 7.88 at Sanchore (Rajasthan)  Executive Engineer Narmada Canal Proj. Dn. I, Sanchore (Rajasthan) Tel.[02979]223903 Work of Lining of Narmada Main Canal  K.M. 0.00  to 7.88  656.06 12/8/1999 12/8/2001 20/5/2001
 ALNIA DAM Chambal Project Dn., Kota(Rajasthan) Executive Engineer, Chambal Project Dn., Kota Providing Cemet Concrete Lamina in Upstream of Alnia Dam R.D.120 to 460 m 133.12 24/2/1999 23/7/1999 17/5/1999
Narmada Main Canal  K.M. 52.75 to 53 km at Sanchore (Rajasthan) Executive Engineer Narmada Canal Proj. Dn. I, Sanchore (Rajasthan) Tel.[02979]223903 Construction of Syphon of NMC Between RD 52.75 to 53 km 388.00 21/11/1996 21/5/1998 18/5/1998
Bisalpur Deoli Distt.Tonk (Rajasthan) Executive Engineer, Bisalpur, Tonk  Excavation & Lining Right Main Canal  R.D. 480 M to 0 M  101.46 11/7/1996 11/6/1997 11/6/1997
Elecon Engineering Company Ltd., V.V. Nagar, Gujrat Elecon Engineering Company Ltd. Civil Work of Construction of Stacker Reclaimer for CHP Stage-I, Package-II, Section-I, STPS, Raj. 641.49  03/07/1995 14/02/2001 14/02/2001
Sumerpur (Pali) Rajasthan Executive Engineer, Jawai Canal Dn, Sumerpur Construction of Weir on Permeable foundation & other Civil Engineering work from R.D. 15 M to 1020 M. Sukri Innundation Scheme 254.55 1994-95 1995-1996 1995-1996
RSEB Jaisalmer (Rajasthan) Supreintended Engineer GTPP, RSEB, Jaisalmer For Laying , Painting & Commissioning of MS Cross Country Pipe Lines with Valves & specialities including earth work, Contruction of RCC, Pipe , Pedestals, Hanger supports etc of following sizes/State Electricity Board at Ramgarh 123.75 20/9/1994 20/1/1995 20/1/1995
Bisalpur Deoli Distt.Tonk (Rajasthan) Superintending Engineer   Excavation & Lining Right Main Canal from Ch. 1000 to 3000 m  117.33 2/7/1994 10/7/1994 10/7/1994
Bisalpur Deoli Distt.Tonk (Rajasthan) Superintending Engineer   Excavation & Lining Right Main Canal from Ch. 0 to 1000 m  87.42 22/11/93 22/10/94 22/10/94
Kota Thermal Power Station, Kota (Rajasthan) Superintending Engineer (Civil VI) KTPS RSEB, Kota Earth Work in Soil and Rock cutting of switch yard KTPS STAGE-III 37.20  21/01/93 26/7/93 26/7/93
Kota Thermal Power Station, Kota (Rajasthan) Superintending Engineer (Civil II) KTPS RSEB, Kota Earth Work in Soil and Rock cutting for extention of marshalling yard at railway siding stage-III KTPS Kota  78.00 16/06/93 16/06/95 16/06/95
Kota Thermal Power Station, Kota (Rajasthan) Superintending Engineer (Civil II) KTPS RSEB, Kota Construction of drain by excavation in hard rock and construction of rock fill dyke to divert flood water in upstream of jawar tank under zone B&C  63.56 28/04/92 28/12/92 28/12/92
Kota Thermal Power Station, Kota (Rajasthan) Superintending Engineer (Civil I) KTPS RSEB, Kota General Civil Worksof 210 MW of Unit – 5th Stage III at Kota Thermal Power Station. 575.00  11/01/91 7/11/1994 7/11/1994
Jaihind Welding Works Ltd. Ahemdabad,Gujrat Jaihind Welding Works Ltd Work of Excavation for Pipeline, Civil Works for Pump house & RCC Resevoir for Jaihind Welding Works Ltd, at Rampura Agucha Mines of Hindustan Zinc Ltd. 46.00 4/11/1990 9/11/1990 9/11/1990