ALL COMPLETED TENDERS
GOODWILL ADVANCE CONSTRUCTION CO. PVT. LTD. | |||||
LIST OF WORKS COMPLETED | |||||
S.No. | Project Name | Name of the Employer | Description of work | Value of Contract (Rs. Lac) | Date of Issue of Work Order |
1 | CFCL Left Bank Protection | Chambal Fertilisers & Chemical Ltd., Gadepan , Kota | Left Bank protection work of newly constructed dam at Kalisindh | 135.99 | 21/03/2018 |
2 | CFCL Kalisindh Dam | CFCL Gadepan, Kota. | Construction of Low Height Dam at Kalisindh River | 4745.44 | 04/10/2016 |
3 | TOYO Engineering India Private Limited | Toyo Engineering India Private Limited, Mumbai | Raw Water Reservior & General Covil Works for G3OU Project at CFCL Gadepan Kota | 1812.8 | 12/10/2016 |
4 | Jetpura Medium Irrigation project | Executive Engineer, Water Resources Div, Bhilwara | Extension, Renovation and modernization work of Jetpura Medium Irrigation project, Tehsil Mandalgarh District Bhilwara | 1530.6 | 18.07.2016 |
5 | Zuberi | Zuberi Engineering Company,Jaipur | Civil, Structural and Architectural works of balance work of Intake Water Pump House, Desilting Chamber, Raw Water Pump House, under BHEL Package-5 for RRVUNL, 2×660 MW, Stage-V, Unit # 7 & 8- Suratgarh Super Critical TPS, Rajasthan. | 954.785 | 07.09.2015 |
6 | Zuberi | Zuberi Engineering Company,Jaipur | Civil, Structural and Architectural works and Misc. Civil works of Water Intake System consisting of Works at Lhasi Intake & Campus, Balancing Reservoir & Campus and Parwan Intake & Campus for RRVUNL, 2×660 MW, Stage-II, Unit # 5 & 6 Chhabra Super Critical TPS, Rajasthan as per NIT: 03/14-15. | 2933.73 | 25.08.2015 |
7 | GADA Minor SKAP | Executive Engineer, Water Resources SKA Canal Division, Aspur | Renovation And Improvement Of Aspur Branch Canal And Its Minor, Repair of Gada Minor of SKAP Tehsil – Aspur District – Dungarpur | 604.6 | 28.05.2015 |
8 | RMC SKAP | Executive Engineer, Water Resources SKA Canal Division, Aspur | Renovation And Improvement Of Right Main Canal And Its Distributaries Of Skap Tehsil – Aspur District – Dungarpur | 372.546 | 14.03.2015 |
9 | Baroda Branch Canal | Executive Engineer, Water Resources SKA Canal Division, Aspur | Renovation and improvement of Baroda Branch Canal and its Distributaries of SKAP | 358.443 | 14.03.2015 |
10 | Parvati Canal | Executive Engineer, Water Resources Division, Dholpur | Extension, Renovation & Modernization of Parvati Dam & its Canal System, Dist.-Dholpur(Raj) | 1897.86 | 27.12.2014 |
11 | Kakraghat Ogee Weir | Executive Engineer, Hiran Water Resources Division, Kakraghat MP | Construction of OGEE weir at downstream of Kakraghat including river diversion works, all types of R.C.C. work in upstream and downstream cutoff, apron work, pitching works, providing and erection of flap type gates etc. complete construction of weir on Narmada River, District Kakraghat (M.P.) | 9518.25 | 10.10.2014 |
12 | Zuberi | Zuberi Engineering Company, Jaipur | Civil & Structural Works For Chp & Ahp Package For 2×660 Mw Suratgarh Super Critical Tps, Stage-V, Unit # 7 & 8, At Suratgarh, Rajasthan | 5436.65 | 05.08.2014 |
13 | CFCL Parwan | Chambal Fertilisers & Chemical Ltd., Gadepan , Kota | Increasing Height Of Dam At Parwan River | 795.1 | 21.12.2012 |
14 | Sanchore Div 5th | Executive Engineer,Narmada canal Project. Division V,Sanchore. | Execution of earth work, single P.C.C block Lining, Pucca Structure, Diggies, Pump Room, Sump well, Boundary wall, and Supplying, Laying, Jointing, Testing & Commissioning of Distribution network of high Density polyethene [HDPE] pipe with electricity operated motor with desired accessories on the system of arwa, Ogala & Dudhwasan Minors of Panoriya Lift Distributary off taking from 5.375 km (R) of Bhimguda distributary of Narmada Main Canal including designing and layout of machanical work on turnkey basis.” The work Involved completion of HDPE pipe net work to cover culturable command area to turn of 10793.276 hectares. This work also involvet construction of canals their RCC Structures & construction of 102 No’s of pump houses with their all mechanical work & electrical work on turnkey basis | 5964.34 | 21/07/2012 |
15 | Sadhumar Branch Canal,RABLS Dn.no.1, Kareli Distt. Narsinghpur (M.P) | Executive Engineer, RABLS Dn.no.1, Kareli Distt. Narsinghpur (M.P) | Balance workof Earth work and construction of CC lining & structures from Km 9.0 to 21.6 km of Sadhumar Branch Canal & with all Distribution System under RABLS Project, Narsinghpur (M.P) | 2918.62 | 13/02/2012 |
16 | Khargone (M.P.) Dn no.24 | Executive Engineer, N.D. Division No.24, Khargone (M.P.) | Construction of 9nos. Head Regulator of Main Canal between km 80 to km 107.741 & Construction of all Distributories, Minors,Sub Minors upto 40 Hact. Chak including inline Structures & Concrete /Tiles lining between km 80 to125 of Indira Sagar Project Main Canal,Khargone (M.P.) | 4450.41 | 12/9/2008 |
17 | Bothpura Dholpur (Rajasthan) | Executive Engineer, Water Resources Division, Dholpur | Construction of Anicut near Bothpura, Tehsil Rajakhera, District Dholpur | 1300.68 | 21/08/2015 |
18 | Hathwari Dholpur (Rajasthan) | Executive Engineer, Water Resources Division, Dholpur | Construction of Anicut near Hathwari Tehsil Rajakhera, District Dholpur | 1520.82 | 22/08/2013 |
19 | Cheetapura Dholpur (Rajasthan) | Executive Engineer, Water Resources Division, Dholpur | Construction of Anicut near Chheetapura Tehsil Rajakhera, District Dholpur | 1551.05 | 22/08/2013 |
20 | Baretha Dholpur (Rajasthan) | Executive Engineer, Water Resources Division, Dholpur | Construction of Anicut near Baretha Tehsil Rajakhera, District Dholpur | 1581.86 | 22/08/2013 |
21 | Randoli Dholpur (Rajasthan) | Executive Engineer, Water Resources Division, Dholpur | Construction of Anicut near Randoli Tehsil Rajakhera, District Dholpur | 1302.41 | 22/08/2013 |
22 | Chambal Right Main Canal | Executive Engineer,CP Division,Kota (Rajasthan). | CRehabilitation of Chambal Right Main Canal In Patches from Km. 15.200 to Km. 15.610 & Km 32.00 to Km 35.350, Baran & Kota (Rajasthan) | 2071.97 | 27/04/2013 |
23 | Jograwas Bundh Ist & Iind | Executive Engineer, Water Resources Division, Pali | Repair Renovation & Restoration of Jograwas Bundh Ist & IInd Tehsil : Marwar Junction Dist.: PALI | 302.57319 | 27.08.2015 |
24 | Girinanda | Executive Engineer, Water Resources Division, Pali | Renovation Repair & Restoration of Girinanda Tehsil Raipur Dist. PALI | 532.42 | 27.08.2015 |
25 | Dasguda Jakham | Executive Engineer, Water Resources Jakham Project Div Dhariyawad | Renovation and Modernisation of Aquaducts located on RMC exetention and Dasguda & Sathpur Distubutries of Jakham Project. | 145.37 | 20.08.2013 |
26 | Jakham RD 0 to Tail | Executive Engineer, Water Resources Jakham Project Div Dhariyawad | Renovation and Modernisation of Aqueducts located between R.D. 0 to Tail of Jakham projects Right main canal Tehsil : Dhariyawad, Distt. : Pratapgarh ( Raj. ) |
179.72 | 10.06.2014 |
27 | Aspur Branch ,DUNGARPUR (Raj.) | Superintending Engineer,Water Resources Construction Circle,Udaipur (Rajasthan) | 37mm. Thick Shotcreting/ Guniting Work Of Old Rcc Trough Aqueduct Of Rmc And Its System Tehsil : ASPUR District : DUNGARPUR (Raj.) | 175 | 26/11/2012 |
28 | Aspur Branch Canal,DUNGARPUR (Raj.) | Superintending Engineer,Water Resources Construction Circle,Udaipur (Rajasthan) | Strengthening of various aqueduct by Shotcreting / Guniting strengthening of pipe aqueduct filling reaches of Aspur Branch Canal and construction of Damage aqueduct Lodawal Sub minor and remaining excavation of Lodawal minor of Som Kamla Amba Project. Tehsil : ASPUR District : DUNGARPUR (Raj.) | 198.62 | 26/11/2012 |
29 | Shiv Sagar,Bhilwara | Superintending Engineer Water Resources Circle Bhilwara (Rajasthan) | Rehabilitation of Dam &Canal works of Shiv Sagar ( Bandar Mutha) Minor Irrigation Project, Tehsil Mandalgarh Distt. Bhilwara | 168.3 | 3/12/2012 |
30 | Gudha Dam, Bundi | Executive Engineer, Water Resources Division, Bundi | Rehabilitaion of Gudha Dam (including Civil & Mechanical ) under R.W.S.R.P.(Dam Safety) Distt. Bundi Raj. | 3207.29 | 9/1/2012 |
31 | Orai Dam, Chittorgarh | Executive Engineer, Water Resources Division, Chittorgarh | Rehabilitation of Earthen Dam, Non over flow and over flow portion of Orai Irrigation Project Distt. Chittorgarh (Rajasthan) | 1591.09 | 7/2/2011 |
32 | The Indure Private Ltd. | The Indure Private Ltd. New Delhi | Civil Works at RRVUNL-Chhabra TPP-2×250 MW Units # 3&4-Civil Works for Wagon Tippler, Stacker Reclaimer, Stock Pile, Transfer Towers, Electrical Control Rooms/MCC Rooms etc. | 3200 | 19/08/2011 |
33 | Adani Infra India ltd. Kawai Thermal Power Project Distt. Baran(Rajasthan) | Adani Infra India ltd. Kawai Thermal Power Project Distt. Baran | Executioon of Balance Civil, Miscellaneous structural & architectural works for CHP for 1320 MW Kawai Thermal Power Project Village Kawai,Tehsil Atru,Distt. Baran Raj. | 5441.45 | 15/05/2011 |
34 | Adani Power Rajasthan ltd. Kawai Thermal Power Project Distt. Baran (Rajasthan) | Adani Power Rajasthan ltd. Kawai Thermal Power Project Distt. Baran | Execution of Civil & associated Works for construction of an Anicut across River Parwan near Village Baldevpura,Tehsil Atru,Distt. Baran Raj. | 1042.92 | 2/1/2012 |
35 | Arniyali Lift Minor Narmada Canal Project Division IV, Sanchore (Rajasthan) | Executive Engineer, Narmada Canal Project Division IV, Sanchore | Execution of Earth work PCC Block Lining & Pucca Structure of Daboi Minor, Daboi Sub Minor, Dholi Nadi Sub Minor of Daboi Minor, Meghawa Minor, Panawali sub Minor of Arniyali Lift Minor | 1151.20 | 6/2/2010 |
36 | Chambal Right Main Canal Kota & Baran, Rajasthan. | Executive Engineer Chambal Project div. CRMC Kota & Baran, Rajasthan. | Rehabilitation of Chambal Right Main Canal in Patches from Km. 46 to 61.50 Km. in Dist. Kota & Baran, Rajasthan. | 5969.00 | 16/10/2008 |
37 | Godhi Distributory Tandula Durg Chattisgarh | Executive Engineer, Tandula Water Resources Division, Durg Chattisgarh Tel. No.[0788] 2323124, Fax[0788] 2323124 | Remodeling and lining of Godhi Distributory from RD 19010 to 34024 m (Group-IIIrd) | 643.59 | 7/10/2008 |
38 | Godhi Distributory Tandula Durg Chattisgarh | Executive Engineer, Tandula Water Resources Division, Durg (Chattisgarh) Tel. No.[0788] 2323124 Fax[0788] 2323125 | Remodeling and lining of Godhi & Construction & Repair of 22 Nos Structures from RD 9225 to 19010 (Group-IInd ) | 609.91 | 7/10/2008 |
39 | Godhi Distributory Tandula Durg Chattisgarh | Remodeling and lining of Godhi Distributory & Construction & Repair of 18 Nos Structure from RD 0 to 9225 m (Group-Ist ) | Remodeling and lining of Supkona Distributory from Rd 0 M to 6000 M (Group-1st) | 667.68 | 10/10/2008 |
40 | Sanchore Lift Distributary Narmada Sanchore (Rajasthan) | Executive Engineer, Narmada Canal Div. III, Sanchore (Rajasthan) Tel. No.[02973] 224422,Fax [02973] 224422 | Execution of Earth work, Pucca Structures and Cement Concrete Lining By Paver Machine of Sanchore Lift Distributory Km. 10.05 to 46.35 (Tail) off taking from Km. 7.88 of NMC | 1801.16 | 25/07/2008 |
41 | Paladi Sub Minor Narmada Canal Div. III Sanchore (Rajasthan) | Executive Engineer, Narmada Canal Div. III Sanchore (Rajasthan) Tel. No.[02973] 224422, Fax [02973] 224422 | Earth work, Pucca Structure, Single P.C.C. Block Lining of Paladi Sub Minor off-taking form Choura Minor from 1.140 | 333.76 | 10/5/2008 |
42 | Supkona Distributory Tandula Durg Chattisgarh | Executive Engineer, Tandula Water Resources Division, Durg (Chattisgarh) Tel. No.[0788] 2323124 Fax[0788] 2323124 | Remodeling and lining of Supkona Distributory from Rd 16800 M to 22650 M (Group-4th) | 410.19 | 21/04/2008 |
43 | Supkona Distributory Tandula Durg Chattisgarh | Executive Engineer, Tandula Water Resources Division, Durg Chattisgarh Tel. No.[0788] 2323124 Fax[0788] 2323125 | Remodeling and lining of Supkona Distributory from Rd 11250 M to 16800 M (Group-3rd) | 418.95 | 13/03/2008 |
44 | Supkona Distributory Tandula Durg Chattisgarh | Executive Engineer, Tandula Water Resources Division, Durg Chattisgarh Tel. No.[0788] 2323124 Fax[0788] 2323124 | Remodeling and lining of Supkona Distributory from Rd 0 M to 6000 M (Group-1st) | 399.63 | 13/03/2008 |
45 | Punj Llyod Ltd., New Delhi/Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Chabbra Thermal Power Project Chabbre Distt- Baran (Rajasthan) | Punj Llyod Ltd. Gurgaon Tel No. [0124] 2620123 Fax [0124] 2620777 | Civil Work for Coal Handling Plant of 2X250 MW Chhabra Thermal Power Plant, Chhabra (Rajasthan) including Complete Construction of 2 No. Wagon Tippler, Tunnels, Stacker reclaimer, Emergency reclaim hopper. (Excluding Cost of Cement & Steel) | 989.79 | 5/3/2007 |
46 | Bhimsagar Irrigation Project Jhalawar (Rajasthan) | Executive Engineer, Water Resources Division, Jhalawar (Rajasthan) Tel. No.[07432] 232349 Fax [07432] 233855 | Balance work of Rehabilitation of Left & Right main Canal including Distribution System of Bhimsagar Irrigation Project | 510.45 | 19/03/2007 |
47 | Patiala Nadi Kaithal (Haryana) | Executive Engineer, Const. Div. No. 3 Kaithal (Haryana) Tel. No.[01746] 235358 Fax [01746] 235358 | Construction of Siphon Aqueduct at RD 18660 on BML Hansi Branch-Butana Branch Multipurpose Links Channel Crossing on Patiala Nadi including construction of links | 1100.85 | 25/01/2007 |
48 | Tata Project Ltd., Hyderabad/Rajasthan Rajya Vidyut Utpadan Nigam Ltd. | Tata Project Ltd. Secunderabad Tel No. [040] 66238801 Fax 66172535 | Civil Foundation work package for foundation in main plant area of RRVUNL at 1X195 MW Kota Super Thermal Power Station Stage V unit #7, Kota (Raj.) (Excluding Cost of Cement & Steel) | 702.00 | 15/12/06 |
49 | Minimata bango Canal Dn. No.5, Kharsia,Distt-Raigarh, Chattisgarh | Executive Engineer, Minimata bango Canal Dn. No.5, Kharsia Tel. No.[07762] 272414 Fax [07762] 272414 | Construction of Cement Concrete Lining of Kharsia branch Canal From R.D. 11000 M. to 21825 m. and 22690 m. to 24600 | 1133.30 | 21/02/2006 |
50 | Ratoda Distributory Narmada Canal Division-IInd, Sanchore (Rajasthan) | Executive Engineer, Narmada Canal Division-IInd, Sanchore Tel. No.[02973] 224422, Fax [02973] 224422 | Execution of Earth work, Pucca Structure & Single P.C.C Block the Lining of Ratoda Distributory | 1009.88 | 11/12/2005 |
51 | Tandula Main Canal from Mile 46 to 68.80 Durg (Chattisgarh) | Executive Engineer, Tandula Water Resources Division, Durg (CG) Tel. No. [0788] 2323124 Fax[0788] 2323124 | Remodeling and C.C. Lining by paver Machine Including 14 No’s structures of Tandula Main Canal form Mile 46 to 68.80 | 2565.81 | 31/10/2005 |
52 | Delhi Water Supply Scheme From RD 201872 to 223000 Except through section from Rd 219800 to 221300 | Executive Engineer, Const. Division NO. Sonipat,Haryana | Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 201872 to 223000 Except through section from Rd 219800 to 221300 | 585.42 | 17/7/2005 |
53 | Delhi Water Supply Scheme From RD 175000 to 201872 | Executive Engineer, Const. Division No. 24, Panipat,Haryana | Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 175000 to 201872 | 564.04 | 26/7/2005 |
54 | Delhi Water Supply Scheme From RD 145250 to 175000 | Executive Engineer, Const. Division No. 23, Panipat,Haryana | Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 145250 to 175000 | 576.81 | 20/7/2005 |
55 | Delhi Water Supply Scheme From RD 223000 to 243700 | Executive Engineer, Const. Division Sonipat, Haryana | Construction Carrier lined Channel for Delhi Water Supply Scheme From RD 223000 to 243700 | 527.09 | 15/6/2005 |
56 | Nandsamand Irrigation project. Rajsamand(Raj.). | Executive Engineer, Water Resources Division Rajsamand(Raj)Tel. No.[02952] 230002 Fax [02952] 230714 | Rehabilitation of Right Main Canal &Rajiyawas minor including pucca works of Nandsamand Irrigation project | 536.00 | 30/06/2004 |
57 | Narmada Main Canal from Km. 65.00 to 74.00 at Sanchore (Rajasthan) | Executive Engineer Narmada Canal Proj. Dn. II, Sanchore (Rajasthan) | Execution of Earth work, Cement Concrete Lining By Paver Machine & Pucca Structures of Narmada Main Canal from Km. 65.00 to 74.00 . | 746.70 | 6/3/2004 |
58 | Rajasthan Giral Lignite Thermal Power Plant Distt. Barmer (Rajasthan) | Executive Engineer GLTPP, RVUNL, Barmer | Construction of Raw Water Reservoir & Pump House GLTPP, Barmer | 235.43 | 27/1/2004 |
59 | Ghambhiri Dam Distt.- Chittorgarh(Raj.) | Executive Engineer , Water Resource Dn. !st Chittorgarh (Raj.) | Construction of Additional Spillway remoulding at spillway arrangement work, widening of embankment etc. at Gambhiri Dam. | 728.01 | 31/10/2003 |
60 | Visnagar Distt. Mehsana, Gujrat | Executive Engineer Dharoi Canal Dn. No. 3 Visnagar Distt. Mehsana, Gujrat | Constructing Weir,Diaphgram wall, Training wall & protection work of Bhakhar Water Resources Project near Village Vanangla, Taluka Unjha, Dist Mehsana of Gujrat State. | 381.09 | 27/6/2003 |
61 | Gudha Irrigation Project Distt. Bundi (Rajasthan) | Executive Engineer, Irrigation Div. Bundi (Rajasthan) | Rehabilitation of RMC Gudha project Bundi | 781.00 | 25/03/2003 |
62 | (1X195 MW stage – IV at Kota Tharmal Power Station. | Superintending Engineer, Civil RRVUNL KTPS, Kota | Civil and architectural works in super structure of Main Power House Building for Unit – VIth (1X195 MW stage – IV at Kota Tharmal Power Station. | 264.36 | 24/05/2002 |
63 | Narmada Main Canal K.M. 7.88 to 51.50 at Sanchore (Rajasthan) | Executive Engineer Narmada Canal Proj. Dn. I, Sanchore (Rajasthan) Tel.[02979]223903 | Earth work, cement concrete lining by paver machine, pucca structures for Narmada Main Canal K.M. 7.88 to 51.50 | 3692.00 | 1/3/2002 |
64 | Rajasthan Rajya Vidyut Utpadan Nigam Ltd.,Kota Thermal Power Station, Kota (Rajasthan) | Superintending Engineer, Civil RRVUNL KTPS, Kota | Hard Rock Foundation & Other associated works for Boiler area, Mill bay & ESP area Unit VI, KTPS, Kota (Raj.) | 300.55 | 3/12/2001 |
65 | Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan | Superintending Engineer,(Civil III) RVUN STPS, Suratgarh | Construction of C.W. Pump House STPS for Stage –III, Unit V, Suratgarh. | 170.88 | 31/10/2001 |
66 | Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan | Superintending Engineer,(Civil III) RVUN STPS, Suratgarh | Construction of Desilting Chamber Intake Pumphouse & Other associated works. | 247.79 | 13/09/2001 |
67 | Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan | Superintending Engineer, (Civil III )RVUN STPS, Suratgarh | RCC Foundation & Other associated works for ESP & ID Unit – 5 at STPS Stage –III. | 207.15 | 8/6/2001 |
68 | Rajasthan Rajya Vidyut Utpadan Nigam Ltd. Suratgarh Thermal Rajasthan | Supreintending Engineer STPS, RRVUNL, Suratgarh | Civil work at CHP Package C Stage II, STPS RRVUNL Suratgarh, | 375.00 | 8/5/2001 |
69 | Gammon India Limited, Mumbai | Gammon India Limited for Kota Thermal Power Station | Construction of Hard Rock Excavation for Foundation of Cooling Tower with casting of RCC raft for Unit VIth of Kota Thermal Power Station. | 35.00 | 8/10/2001 |
70 | Narmada Main Canal K.M. 0.00 to 7.88 at Sanchore (Rajasthan) | Executive Engineer Narmada Canal Proj. Dn. I, Sanchore (Rajasthan) Tel.[02979]223903 | Work of Lining of Narmada Main Canal K.M. 0.00 to 7.88 | 656.06 | 8/12/1999 |
71 | ALNIA DAM Chambal Project Dn., Kota(Rajasthan) | Executive Engineer, Chambal Project Dn., Kota | Providing Cemet Concrete Lamina in Upstream of Alnia Dam R.D.120 to 460 m | 133.12 | 24/2/1999 |
72 | Narmada Main Canal K.M. 52.75 to 53 km at Sanchore (Rajasthan) | Executive Engineer Narmada Canal Proj. Dn. I, Sanchore (Rajasthan) Tel.[02979]223903 | Construction of Syphon of NMC Between RD 52.75 to 53 km | 388.00 | 21/11/1996 |
73 | Bisalpur Deoli Distt.Tonk (Rajasthan) | Executive Engineer, Bisalpur, Tonk | Excavation & Lining Right Main Canal R.D. 480 M to 0 M | 101.46 | 7/11/1996 |
74 | Elecon Engineering Company Ltd., V.V. Nagar, Gujrat | Elecon Engineering Company Ltd. | Civil Work of Construction of Stacker Reclaimer for CHP Stage-I, Package-II, Section-I, STPS, Raj. | 641.49 | 03/07/1995 |
75 | Sumerpur (Pali) Rajasthan | Executive Engineer, Jawai Canal Dn, Sumerpur | Construction of Weir on Permeable foundation & other Civil Engineering work from R.D. 15 M to 1020 M. Sukri Innundation Scheme | 254.55 | 1994-95 |
76 | RSEB Jaisalmer (Rajasthan) | Supreintended Engineer GTPP, RSEB, Jaisalmer | For Laying , Painting & Commissioning of MS Cross Country Pipe Lines with Valves & specialities including earth work, Contruction of RCC, Pipe , Pedestals, Hanger supports etc of following sizes/State Electricity Board at Ramgarh | 123.75 | 20/9/1994 |
77 | Bisalpur Deoli Distt.Tonk (Rajasthan) | Superintending Engineer | Excavation & Lining Right Main Canal from Ch. 1000 to 3000 m | 117.33 | 7/2/1994 |
78 | Bisalpur Deoli Distt.Tonk (Rajasthan) | Superintending Engineer | Excavation & Lining Right Main Canal from Ch. 0 to 1000 m | 87.42 | 22/11/93 |
79 | Kota Thermal Power Station, Kota (Rajasthan) | Superintending Engineer (Civil VI) KTPS RSEB, Kota | Earth Work in Soil and Rock cutting of switch yard KTPS STAGE-III | 37.20 | 21/01/93 |
80 | Kota Thermal Power Station, Kota (Rajasthan) | Superintending Engineer (Civil II) KTPS RSEB, Kota | Earth Work in Soil and Rock cutting for extention of marshalling yard at railway siding stage-III KTPS Kota | 78.00 | 16/06/93 |
81 | Kota Thermal Power Station, Kota (Rajasthan) | Superintending Engineer (Civil II) KTPS RSEB, Kota | Construction of drain by excavation in hard rock and construction of rock fill dyke to divert flood water in upstream of jawar tank under zone B&C | 63.56 | 28/04/92 |
82 | Kota Thermal Power Station, Kota (Rajasthan) | Superintending Engineer (Civil I) KTPS RSEB, Kota | General Civil Worksof 210 MW of Unit – 5th Stage III at Kota Thermal Power Station. Executed the civil works of main power-house building, construction of Turbogenerator foundation, foundations of all pumps, motors, fans, C.W. pump/motor floors, civil works/ foundations work for switch yard & transformer yard, B.C.W. tank & miscelleous pump house, E S P control room building & all misc. Civil works, at various location & elevations varies from EL. (-) 8.00 M to (+) 60.00 M EL. |
575.00 | 11/01/91 |
83 | Jaihind Welding Works Ltd. Ahemdabad,Gujrat | Jaihind Welding Works Ltd | Work of Excavation for Pipeline, Civil Works for Pump house & RCC Resevoir for Jaihind Welding Works Ltd, at Rampura Agucha Mines of Hindustan Zinc Ltd. | 46.00 | 11/4/1990 |